It's been awhile since I've been able to update, we exceeded our download limit last month and trying to upload photos on a slow connection was doing my head in! But we are back to normal speed so it's time to share the bricking progess ...
 |
Windows intalled |
 |
Bi-Fold doors installed (no glass) |
 |
Kitchen Window splashback in place! |
 |
Bricking commenced! |
 |
Back Window |
 |
Door Frames in (including the cavity sliders inside) |
 |
Front bricking in progress |
 |
One side nearly done! |
At this stage they are hoping for bricking to be finished by this week and have the roofing started as well.
No comments:
Post a Comment